Project profile · Public buildings

In November 2024, Tam Quang Minh signed a contract to renovate the wood interior of the Block A assembly hall at the Da Nang Political School.

By TQM TeamDa Nang, VietnamUpdated 30 October 20262 min read
Da Nang Political School assembly hall, interior fit-out by Tam Quang Minh
Da Nang Political School assembly hall, interior fit-out by Tam Quang Minh. Photo: Tam Quang Minh
ProjectDa Nang Political School
ScopeWood interior renovation of the Block A assembly hall
Contract signed11/2024

Key points

  • Scope: Wood interior renovation of the Block A assembly hall
  • Contract signed: 11/2024

The brief

The project was part of the city-funded upgrade of the Da Nang Political School at 34 Ho Nghinh, Son Tra District. Our package covered the interior of the Block A assembly hall: new acoustic and decorative wall cladding, feature wall panels and hardwood doors, after removing the old aluminium, glass and gypsum partitions.

Da Nang Political School assembly hall, a Tam Quang Minh interior project
Da Nang Political School assembly hall, a Tam Quang Minh interior project
Walnut-finish double wooden doors at Da Nang Political School, made and installed by Tam Quang Minh
Walnut-finish double wooden doors at Da Nang Political School, made and installed by Tam Quang Minh
Walnut-finish double wooden doors at Da Nang Political School, made and installed by Tam Quang Minh
Walnut-finish double wooden doors at Da Nang Political School, made and installed by Tam Quang Minh

Photos: Tam Quang Minh

Da Nang Political School assembly hall, a Tam Quang Minh interior project. Photo: Tam Quang Minh

The acoustic wall system

  • Sub-frame in galvanised steel box sections 40×40 and 20×40 mm, 1.4 mm wall thickness
  • Perforated, moisture-resistant HDF face panels with a veneer finish
  • Behind the panels: a 10 mm acoustic rubber-foam layer and two layers of 40 mm glass wool
  • Feature walls in 9 mm moisture-resistant HDF, engraved on our CNC machines

Samples first, then improvements on site

Before full production we built two full-size sample panels for the client and project management board; both were accepted as meeting the acoustic and aesthetic requirements. During installation we proposed two improvements: an additional 30×30 mm steel frame with wire mesh to hold the glass wool firmly inside the wall, and a nylon membrane behind the perforations so that no glass-fibre dust can reach the room.

Hardwood doors and trims

Door frames, 40 mm door leaves and trims were made in Group II hardwood (kien kien) and finished in PU, with new lever locks, hinges and stainless-steel handles.

Documented materials

Every material batch was inspected and accepted on site with its certificates of origin and quality, including the steel sections, glass wool, acoustic foam and the E2-grade moisture-resistant HDF board.

Project summary

Da Nang Political School: Tam Quang Minh delivered wood interior renovation of the Block A assembly hall (contract signed 11/2024).

Related service: School and public building interiors.

Planning a similar project or an export order? See our manufacturing capabilities and product range, or request a quote.

Project Q&A

What did Tam Quang Minh deliver at Da Nang Political School?

Wood interior renovation of the Block A assembly hall.

When was the project carried out?

Contract signed: 11/2024.

More projects

Planning a similar project?Send drawings or a tender pack. Our project team will contact you to discuss the details.

WhatsApp
Get a quote
Email